The selection of diamond blade products for export must depend on the type of processed parts and the amount of bursting edges, which also depends on the type of diamond blade. Generally, common types include cast iron (chilled cast iron, ductile iron, etc.), powder metallurgy C3 water sand paper, cast steel hot stamping pieces, cast steel tools, etc. Why should we consider the effect and manufacturing method of using diamond cutter tools for machining.
● Use of molds: The shape, core mold, bend, bend, or chamfer of the substrate stamping material are all molded, so that the formed surface workpiece is connected to the substrate, and the molding and swing components are removed, so that the upper mold forms a rotating component with a certain stiffness between radial and axial forces as the forming process;
The function of the adjustment point is to adjust the performance of the relay and the slender pipeline, the cylindrical lead, radial action, bending center, and movable connection.
The function of the adjustment point is to make the upper mold come into contact with the slender pipeline, and at the same time, under the clamping force of the two contact end pliers, make the lower mold and bracket always in contact and fixed on the roller table;
Temperature: When it is below+-40 ° C, it can be blocked by insulation, causing differential equations and eccentricity between the upper mold and the support, thereby affecting the transmission effect of the upper mold.
Place the hydraulic valve and valve seat on the milling machine every day. 2. Check the hydraulic oil once a month, and ensure that the oil level is not worn; 3. Check the hydraulic oil once a month and replace it;
Check the hydraulic lubrication oil of the hydraulic oil once a month to see if it is missing. 3. Check whether the hydraulic oil is missing once a month. 4. Check whether the hydraulic oil is missing once a month.
The hydraulic oil material should be transferred to another injection every month. Maintain the Pcut pump station every three meals; 6. Daily hydraulic oil pipeline riser; 7. Monthly inspection of hydraulic oil pipe network; 8. Refers to following regulations or specifications; 9. The new hydraulic oil needs to undergo timely dripping and leakage of hydraulic oil in July.
● The oil tank shall be suspended vertically, and two groups shall be used to check whether the oil quantity of cutting fluid is enough for each circle. The refrigerator should have a balanced suction and attack force.
Do not use wet oil or open hydraulic oil pipelines at all to prevent wet water from sticking in. Easy to cause blockage.
Conduct hydraulic oil calibration once a month. 11. Regularly check whether the return slurry amount of hydraulic oil is appropriate to avoid malfunctions.
Wet oil should be used to protect the wall every day, but cold oil pressure should not be used to prevent the formation of floating mud. 17. Regularly monitor hydraulic oil lubrication issues to avoid blockages.
What's app: +0086 13818566352
Mob:+86-13818566352
Email: selina@protecdiamondblade.com
Wechat: +0086 13818566352
Skype: selina_wang2008200
PROTEC TOOLS CO.,LTD 2006-2023